 For the record. The crane driver was Dave Poole. He left in 1983/4, he worked the crane for years.
MoK

Offline lutonman1

  • Jr. Member
  • **
  • Posts: 53
  • Appreciation 2
Re: No 10 Crane
« Reply #25 on: December 02, 2017, 15:40:05 »
I read with interest the restoring of crane No 4412 on No 2 dock. I have driven this crane, mainly on
holiday relief duties. The ` hot plate ` allowed the drive to make tea, as well.  I believe the hot plate
was 240 volts, as most larger cranes ran on 440 volts. Lighting circuits 220/30 volts
The` Portal ` crane`s dotted about the dockyard, were named after Air Marshall Portal, for use after D Day.
They had a two gear system for the hoist control ` medium ` and ` very fast `. Most cranes had hot plates.
The crane behind No 4412 was a learning crane, which I learnt on. Later I became a crane instructor on
Portal Crane No 732, a 5 ton, on basin 2.
MoK

Offline Bilgerat

  • Established Member
  • *****
  • Posts: 1068
  • Appreciation 245
Re: No 10 Crane
« Reply #24 on: October 15, 2017, 12:58:11 »
I've restored the pictures I took during the restoration of the crane....
"I did not say that the French will not come, I said they will not come by sea" - Lord St Vincent

Offline kyn

  • Administrator
  • Established Member
  • *****
  • Posts: 7410
  • Appreciation 419
    • Sheppey History
Re: No 10 Crane
« Reply #23 on: August 07, 2014, 20:49:18 »
Looking good! :)

Offline DaveTheTrain

  • Full Member
  • ***
  • Posts: 330
  • Appreciation 19
Re: No 10 Crane
« Reply #22 on: August 26, 2012, 22:40:52 »
Thanks Bilegrat.  I wonder, was this powered from the DC generator in the South Pumping House.  I cannot think of another place the generator set could have been.  It would be reasonably easy to switch over to run the crane elecs when power was not required for the pumps.

Cheers
DTT

Offline Bilgerat

  • Established Member
  • *****
  • Posts: 1068
  • Appreciation 245
Re: No 10 Crane
« Reply #21 on: August 26, 2012, 01:16:44 »
It ran on 500v DC.
"I did not say that the French will not come, I said they will not come by sea" - Lord St Vincent

Offline DaveTheTrain

  • Full Member
  • ***
  • Posts: 330
  • Appreciation 19
Re: No 10 Crane
« Reply #20 on: August 25, 2012, 23:58:22 »
Of course, that makes sense.  Any idea what voltage it ran on?
Cheers
DTT

Offline Bilgerat

  • Established Member
  • *****
  • Posts: 1068
  • Appreciation 245
Re: No 10 Crane
« Reply #19 on: August 25, 2012, 23:32:39 »
Hi DTT,

That's where the main winch and main distribution board live. The luffing and slew motors are under the cab. This one never had an on-board generator, it was entirely dependant on an external power supply.
"I did not say that the French will not come, I said they will not come by sea" - Lord St Vincent

Offline DaveTheTrain

  • Full Member
  • ***
  • Posts: 330
  • Appreciation 19
Re: No 10 Crane
« Reply #18 on: August 25, 2012, 22:52:37 »
Thanks Bligey,  nice photographs.  What is in the space behind the crane cab?  I assume that it is either balance weights or had a space for the generator - I think it was self powered at one time.
Thanks
DTT

Offline Sentinel S4

  • Established Member
  • *****
  • Posts: 1943
  • Appreciation 167
Re: No 10 Crane
« Reply #17 on: August 21, 2012, 17:45:03 »
Wow. Thanks for the running commentary on the refit Bilgerat. It has been very interesting to see parts of the crane that are no longer in use, like the controls. Thanks again for your time taken in posting these great pics. Very interesting from an engineering point of view.

S4.
A day without learning something is a day lost and my brain is hungry. Feed me please.

Offline Bilgerat

  • Established Member
  • *****
  • Posts: 1068
  • Appreciation 245
Re: No 10 Crane
« Reply #16 on: August 21, 2012, 16:11:51 »
This is now finished, the site has been cleared and the temporary fencing removed.





"I did not say that the French will not come, I said they will not come by sea" - Lord St Vincent

Offline Bilgerat

  • Established Member
  • *****
  • Posts: 1068
  • Appreciation 245
Re: No 10 Crane
« Reply #15 on: August 19, 2012, 13:03:13 »
Another update...

The work is now almost complete. As of Thursday, the scaffold has been removed. All the debris from around the bottom of the crane has been swept up and removed. All that remains to paint now is one side of the foot of the base and pick out details such as the main power and emergency stop switches. Once this is done, the site will be cleared and the temporary fencing removed. I'll get some pics of the crane in all it's glory as soon as I can. In the meantime, here's some pics taken a couple of weeks ago but which couldn't be posted.

From the top of the cab looking up at the jib. The second picture shows the air-raid siren which is sounded during the 40's weekends.





The power cable guide. The main 500V DC power supply is about halfway down the dock and this stops the power cable from being trapped on the rails.



The 'handbrake'. These are located on each corner and clamp the crane to its rails, preventing it from moving.



Emergency stop switch. There are three of these.



Traveller motor. There are two of these, in opposite corners. They are geared to the wheels. Note the brake shoes around the shaft. These are operated by the brake pedals in the drivers cab.



Central bearing under the turret.



Rollers which sit on top of the slew ring under the turret.





The down-side to all this is that the newly re-painted Dock Crane No 4412 (to give it it's proper title) now serves to show what poor condition the other cranes are in. I think the intention is to refurbish the other cranes, but this is dependant on funding.



"I did not say that the French will not come, I said they will not come by sea" - Lord St Vincent

Offline kyn

  • Administrator
  • Established Member
  • *****
  • Posts: 7410
  • Appreciation 419
    • Sheppey History
Re: No 10 Crane
« Reply #14 on: August 07, 2012, 13:38:15 »
A photo from the 3rd August

Offline Bilgerat

  • Established Member
  • *****
  • Posts: 1068
  • Appreciation 245
Re: No 10 Crane
« Reply #13 on: August 01, 2012, 20:43:02 »
Work continues apace. The cab/winch-house is now dark grey down to its base. The legs are starting to turn pink as is the void in the middle where the central slew bearing and the roller bearings are located.

Will try to make time to get into the space under the cab to get some pics of the luffing motor and slew motor, both of which are substantial bits of kit.

The upper part of the scaffold down to the top of the base will probably be struck next week. Also, the glaziers will be in next week to replace the broken windows and hopefully, bird-spikes and netting will be put in place too. We're never going to stop pigeons getting on it and making a mess of it, but we'll be making it as hard for them as we can :)
"I did not say that the French will not come, I said they will not come by sea" - Lord St Vincent

Offline Sentinel S4

  • Established Member
  • *****
  • Posts: 1943
  • Appreciation 167
Re: No 10 Crane
« Reply #12 on: July 26, 2012, 20:32:42 »
Hi Bilgerat. Like DTT I am enjoying this series of pics and writings, he keeps beating me to the questions though. I like the locking plate for the slew gear, it could not be more simple and holds itself in place. Brilliant pics of the control gear, they answer a lot of questions. Those drivers must have been dancing all over controlling these machines.

S4.
A day without learning something is a day lost and my brain is hungry. Feed me please.

 